Dunmore – The following work is scheduled for this week throughout Northeastern Pennsylvania.  Anyone wishing to sign up for PennDOT Travel Advisories can do so by emailing James May at jamay@pa.gov

Follow/like PennDOT on Twitter at 511PANortheast and Facebook at Pennsylvania Department of Transportation (PennDOT).

Please note all work depends on weather conditions.

Please follow PennDOT on Twitter at 511PANortheast and Like us on facebook at Pennsylvania Department of Transportation (PennDOT).

Please note: Central Scranton Expressway will be closed starting on Wednesday, April 18, 2018 from 8 p.m. to Monday, morning April 23 at 6 a.m.   Please note that the car detour will be Moosic Street and the truck detour will be Davis Street for the start of the removal of the old Harris Avenue Bridge over the expressway.

Starting Wednesday, April 18 through the end of the month PennDOT will be conducting a pothole blitz across District 4.

Lackawanna County

The Pennsylvania Department of Transportation Engineering District 4 will hold a public meeting on Thursday, April 26 at Thornhurst Volunteer Fire Co 125 Old River Road, Thornhurst Township starting at 7 p.m. to discuss a county bridge project on SR 2013.  The project involves the replacement of the state owned SR 2013 Bridge over Pond Creek in Thornhurst Township, Lackawanna County.  The purpose of this meeting is to provide the PennDOT staff an opportunity to explain the project and answer questions on an information basis.  Preliminary plans will be available for review.

There will traffic issues on SR 3019 (Spring Street in Moosic and SR3024 (Main Street) Moosic on Saturday April 21, 2018 for the Moosic Little League Parade from 8:30 a.m. to 9:30 a.m.

There will be traffic issues on Sunday, April 29 throughout Lackawanna County for the Tour de Scranton starting at 9 a.m. Traffic will be effected  as the bikers ride from Scranton HS to Forest City HS then around Elk MT and back to Scranton HS.  The ride is approx. 65 miles.  Please be advised that bikers will be on local and state road throughout the day.

Short Term 

SR 247-Church, Grassy Island-Jessup/Blakely/Archbald-Moving-Sweeping-23-Apr-18-27-Apr-18-7 a.m. to 3 p.m.

SR 307-Morgan HWY-S. Abington-Single-Patching-Monday, April 23, 2018-Friday, April 27, 2018-7 a.m. to 3 p.m. .

SR 435-S.R. 435-Roaring Brook Twp.-Single lane-manual Patching-Friday 04/27/2018-Friday 04/27/2018-4 a.m. to 2 p.m.

SR 1025-Wemberly Road-Scott Twp.-Single-Pipe Trench Patching-27-Apr-18-27-Apr-18-7 a.m. to 3 p.m.

SR 1027-Layton Rd-S. Abington-Single-Patching-Monday, April 23, 2018-Friday, April 27, 2018-7 a.m. to 3 p.m.

SR 2005-Aberdeen Rd. -Madison Twp.-Single lane-manual Patching-Friday 04/27/2018-Friday 04/27/2018-4 a.m. to 2 p.m

SR 2008-Marshwood Rd.-Throop Borough-Single lane-manual Patching-Friday 04/27/2018-Friday 04/27/2018-4 a.m. to 2 p.m.

SR 3011-Keyser Ave/Drakes Lane-Old Forge-Single-Patching-Monday, April 23, 2018-Friday, April 27, 2018-7 a.m. to 3 p.m.

SR 3019-Spring St-Moosic-Single-Patching-Monday, April 23, 2018-Friday, April 27, 2018-7 a.m. to 3 p.m.

SR 4024-Winola Rd-Clark Summit-Single-Patching-Monday, April 23, 2018-Friday, April 27, 2018-7 a.m. to 3 p.m.

SR 6006-Business Rt. 6-Archbald-Single-Pothole Patching-27-Apr-18-27-Apr-18-7 a.m. to 3 p.m.

Long Term

SR 1012, Archbald Borough- At the intersection of Kennedy Drive and County Road, work is taking place to form a four-way intersection with the opposite Borough street. A new traffic signal will be installed at this intersection as well, and Kennedy Drive will be widened to accommodate a center turn lane from Main Street to Monica Drive. An additional left turn lane may be added on Main for left turns on to Kennedy Drive. The project should be completed by the summer of 2018.

Bridge Now Open to traffic . SR 6011(Harrison Avenue), Scranton - As part of the ongoing project to replace the Harrison Avenue Bridge, the Central Scranton Expressway is a single lane pattern in each direction.  The project completion is 2018.