The following work is scheduled for this week throughout Northeastern Pennsylvania.  Anyone wishing to sign up for PennDOT Travel Advisories can do so by subscribing  to PennDOT news in Lackawanna, Luzerne, Pike, Susquehanna, Wayne, and Wyoming counties atwww.penndot.gov/District4  Follow/like PennDOT on Twitter at 511PANortheast and Facebook at Pennsylvania Department of Transportation (PennDOT).

Interstate 81

Baseball is back: Please note there will be traffic issues at Davis Street, I-81 and Montage Mountain Road, Moosic, at the beginning and end of the games.  There will games:

Monday, July 15 at 7:05 PM;  Tuesday, July 16 at 7:05 PM;  Wednesday, July 17 at 12:05 PM;  Thursday, July 18 at 7:05 PM;  Friday, July 19 at 7:05 PM; July 20 at 6:35 PM and Sunday, July 21 at 1:05 PM.

Concert at the Toyota Pavilion at Montage Mountain on July 12 Third Eye Blind/ Jimmy Eat starting at 6 PM. Thursday, July 18 to Saturday, July 20  Camp Bisco and July 26 The Peach Music Festival starting at 8 PM.

Lackawanna County

There will be traffic issues on Courthouse Square (Washington Avenue) i Scranton on Saturday, July 20 from 9:00 AM to 9 PM. for the annual art festival.

Short Term

SR 11-Pittston Ave-Scranton-Single Lane-Manual Patching-Monday, July 15, 2019-Friday, July 19, 2019-7:00 AM to 3:00 PM

SR 307-Morgan HWY-S Abington -Single Lane-Manual Patching-Monday, July 15, 2019-Friday, July 19, 2019-7:00 AM to 3:00 PM

SR 1012-Archbald Mt. Rd. -Archbald -Single Lane - Flagging-Ditching and drainage improvements-Friday 07/19/2019-Friday 07/19/2019-7:00 AM to 2 PM

SR 2003-Cortez Rd.-Jefferson Twp.-Single Lane - Flagging-Ditching and drainage improvements-Friday 07/19/2019-Friday 07/19/2019-7:00 AM to 2 PM

SR 2005-Aberdeen Rd.-Jefferson Twp.-Single Lane - Flagging-Ditching and drainage improvements-Friday 07/19/2019-Friday 07/19/2019-7:00 AM to 2 PM

SR 4010-Ackerly-Abington/Glenburn-Single Lane-Manual Patching-Monday, July 15, 2019-Friday, July 19, 2019-7:00 AM to 3:00 PM

SR 4011-Old State Rd-Abington/Glenburn-Single Lane-Rock line ditch-Monday, July 15, 2019-Friday, July 19, 2019-7:00 AM to 3:00 PM

SR 4017-Gravel Pond Rd-Glenburn/Newton-Single Lane-Manual Patching-Monday, July 15, 2019-Friday, July 19, 2019-7:00 AM to 3:00 PM

SR 4026-Grove-Clark Summit Boro-Single Lane-Manual Patching-Monday, July 15, 2019-Friday, July 19, 2019-7:00 AM to 3:00 PM

SR 6011-Greenridge St-Scranton-Single Lane-Manual Patching-Monday, July 15, 2019-Friday, July 19, 2019-7:00 AM to 3:00 PM

Long Term

SR 307 Bridge over I-81 (Moosic St., Scranton)The project will resume on April 1, 2019 additional work will be needed and the project will now be completed by the fall of 2019.

SR 307 at Shady Lane, Rd, Lackawanna County, South Abington Township:  The proposed project consists of the precast concrete box culvert extension of an existing arch culvert (over Summit Lake Creek) with cast-in-place concrete collar, precast wingwalls and precast end section. Other work includes roadway/ shoulder improvements, guiderail, installation of rock lined swales, slope stability, utility relocation, rock scour protection, concrete arch structure repair, temporary traffic control, temporary traffic signals, excavation, drainage, landscaping, E & S control measures, pavement markings and temporary excavation.

The temporary traffic signal will be in place starting on April 9.  The project should be completed by October 2019.

SR 435 resurfacing project. The project starts at SR 380 and continue to Moscow.  The project will resurface a total of 18.26 miles.   The project started in May 2019 and should be completed October 2019.

SR 3022 Central Scranton Expressway, Scranton, PA.  Retaining wall repair, Safety improvements and paving work on the Central Scranton Expressway.  The project is excepted to be completed by fall of 2019.  Please be advised that there will new traffic patterns on the Central Scranton Expressway.  The inbound and outbound lanes are now on the opposite side of the expressway.